Section 3
Survey, Generation, Transmission Or Distribution Of Electricity:
3. Survey, Generation, Transmission or Distribution of Electricity:
No person shall be entitled to conduct survey, generation, transmission or distribution of electricity without obtaining license under this Act. Provided that no license shall be required to be obtained by a national or a corporate body for the generation, transmission or distribution of electricity up to 1000 kilowatt and for conducting necessary survey thereof. Before generating, transmitting or distributing hydroelectricity of the capacity ranging from 100 kilowatt to 1000 kilowatt, information to hat effect shall be given to the prescribed officer in a manner as prescribed.
No person shall be entitled to conduct survey, generation, transmission or distribution of electricity without obtaining license under this Act. Provided that no license shall be required to be obtained by a national or a corporate body for the generation, transmission or distribution of electricity up to 1000 kilowatt and for conducting necessary survey thereof. Before generating, transmitting or distributing hydroelectricity of the capacity ranging from 100 kilowatt to 1000 kilowatt, information to hat effect shall be given to the prescribed officer in a manner as prescribed.